Index of /apollo/Documents/IMCC

[ICO]NameLast modifiedSizeDescription

[PARENTDIR]Parent Directory  -  
[   ]Agenda for Presentation by Prospective Contractors on IMCC Procurement.pdf2022-07-08 06:03 697K 
[   ]Apollo Mission Control Center.pdf2022-07-08 06:03 760K 
[   ]Apollo Operational Control and Information Flow Design and Development Contract.pdf2022-07-08 06:03 5.8M 
[   ]Apollo Recovery Control Centers - Rough Draft.pdf2022-07-08 06:04 762K 
[   ]Contractor Accrued Cost.pdf2022-07-08 06:04 2.0M 
[   ]Day to Day Contact - Mercury Experience.pdf2022-07-08 06:05 3.1M 
[   ]EECOM Engineer Console.pdf2022-07-08 06:05 963K 
[   ]Events Leading to Evaluation.pdf2022-07-08 06:06 4.8M 
[   ]Fact Sheet - Mission Control for Manned Space Flight.pdf2022-07-08 06:57 6.5M 
[   ]Final Report on the Technical Evaluation of the Industry Response to NASA RFP MSC-60-12.pdf2022-07-08 06:07 7.2M 
[   ]Gross Obligations.pdf2022-07-08 06:07 830K 
[   ]IBM Tour - Manned Spaceflight Control Center.pdf2022-07-08 06:08 7.2M 
[   ]IMCC Console Layout.pdf2022-07-08 06:08 778K 
[   ]IMCC Contractor Evaluation.pdf2022-07-08 06:08 4.6M 
[   ]IMCC Evaluation.pdf2022-07-08 06:09 12M 
[   ]IMCC Milestones.pdf2022-07-08 06:10 6.5M 
[   ]IMCC Plans.pdf2022-07-08 06:11 3.2M 
[   ]IMCC Program Cost Summary.pdf2022-07-08 06:11 2.5M 
[   ]Interim Audit and Status Report IMCC.pdf2022-07-08 06:12 18M 
[   ]Kaiser - Design Criteria and Concepts for IMCC.pdf2022-07-08 06:15 45M 
[   ]Kraft IMCC Eval Notes.pdf2022-07-08 06:16 7.0M 
[   ]Kraft Notes on IMCC Evaluation.pdf2022-07-08 06:17 2.2M 
[   ]List of Technical Reports and Memorandums Concerning Human Factor Engineering.pdf2022-07-08 06:56 1.6M 
[   ]MCC Contractual History - Attachment F.pdf2022-07-08 06:19 12M 
[   ]MCC Development History - Ray Love.pdf2022-07-08 06:20 23M 
[   ]MCC Plotboard Displays.pdf2022-07-08 06:20 2.3M 
[   ]MCC RFP 1962.pdf2022-07-08 06:22 22M 
[   ]MCC Remote Sites - Rough Draft.pdf2022-07-08 06:21 5.5M 
[   ]Manned Spaceflight Control Center.pdf2022-07-08 06:18 9.9M 
[   ]Memo - Apollo Information Flow.pdf2022-07-08 06:23 1.3M 
[   ]Memo - Eligibility of GE and Western Electric for IMCC.pdf2022-07-08 06:23 1.5M 
[   ]Memo - Eligibility of General Electric for IMCC.pdf2022-07-08 06:55 3.5M 
[   ]Memo - Evaluation of Proposals.pdf2022-07-08 06:24 1.8M 
[   ]Memo - Guidelines for Technical Panels in Conducting Evaluation of Bidder Responses.pdf2022-07-08 06:25 8.9M 
[   ]Memo - Plan to Issue RFP.pdf2022-07-08 06:25 2.5M 
[   ]Memo - Technical Evaluation Plan.pdf2022-07-08 06:25 400K 
[   ]Memo - Technical Evaluation Report - Apollo Operational Control and Information Study Contract.pdf2022-07-08 06:25 514K 
[   ]Memo - Transfer of Computing Equipment from Langley to Houston.pdf2022-07-08 06:26 257K 
[   ]Mercury Flight Control Facilities and Operation.pdf2022-07-08 06:26 6.3M 
[   ]Mercury Rules - Kraft.pdf2022-07-08 06:27 3.2M 
[   ]Philco - Maintenance and Operations Activity - Indoctrination Booklet.pdf2022-07-08 06:31 41M 
[   ]Philco IMCC Contract Review - July 26 1963.pdf2022-07-08 06:28 13M 
[   ]Philco visualizations.pdf2022-07-08 06:32 7.3M 
[   ]RTCC Interim Facility Digital to Television Display Formats Test and Evaluation.pdf2022-07-08 06:35 7.9M 
[   ]Real Time Computer Complex.pdf2022-07-08 06:32 2.0M 
[   ]Report of the Source Evaluation board for the Integrated Mission Control Center.pdf2022-07-08 06:34 24M 
[   ]Slides Required for Apollo Talk.pdf2022-07-08 06:35 9.7M 
[   ]Source Evaluation Board Organization Table.pdf2022-07-08 06:36 882K 
[   ]Statement of Facts for GAO Audit.pdf2022-07-08 06:36 5.6M 
[   ]Status of Foundation-Steel-Deck Contract.pdf2022-07-08 06:54 1.1M 
[   ]Telegram.pdf2022-07-08 06:37 701K 
[   ]Visualizations of IMCC Floorplan.pdf2022-07-08 06:37 8.7M 
[   ]WDL-TR-E120-2.pdf2022-07-08 06:40 46M 
[   ]WDL-TR-E120 and -1.pdf2022-07-08 06:51 180M