Our contract called for the consolidation of the data from the wind tunnels, in the period when pure computer aerodynamic modelling was not yet quite convincing. To get the biggest tunnel to produce winds of 600 mpr took one/twentieth of San Jose's total electrical power supply. A pc computer now can reliably simulate the results at the energy cost of a reading lamp.