Meadville Space Center
Welcome, Guest. Please login or register.
October 31, 2020, 06:09:53 PM

Login with username, password and session length
Search:     Advanced search
Project Apollo - NASSP 6.4.3 released!
http://nassp.sf.net
25068 Posts in 2094 Topics by 2266 Members
Latest Member: twa517
* Home Help Search Login Register
+  Meadville Space Center
|-+  Project Apollo - NASSP
| |-+  Project Apollo - NASSP Development
| | |-+  Modeling (Moderators: movieman, Swatch, lassombra)
| | | |-+  CM Left Side Wall
« previous next »
Pages: [1] Print
Author Topic: CM Left Side Wall  (Read 2934 times)
NoName
Project Team Member
Hero Member
****
Posts: 795


View Profile
« on: April 05, 2007, 03:08:09 PM »

Just a preview how the left side wall of the 2D CM panel will look like...



The black area will be filled with background too.
Logged
Tschachim
Project Apollo - NASSP
Administrator
Hero Member
*****
Posts: 3700


nassp.sf.net


View Profile WWW
« Reply #1 on: April 05, 2007, 06:55:27 PM »

Wow, lots of new coolant loop controls, looks like we're going to have more fun with the ECS!  Thumbs Up

Cheers
Tschachim
Logged

NoName
Project Team Member
Hero Member
****
Posts: 795


View Profile
« Reply #2 on: April 06, 2007, 12:06:56 PM »

Quote
Wow, lots of new coolant loop controls, looks like we're going to have more fun with the ECS!

Yeah. The left side wall includes all corresponding panels also included in NASA's display and controls pdf file. I can't wait to finally lower the cabin pressure for the EVA Happy
Logged
Christophe
Project Team Member
Hero Member
****
Posts: 1072


View Profile Email
« Reply #3 on: April 06, 2007, 03:25:21 PM »

Hi Moonwalker, GREAT WORK!!!
Can't wait  Happy Happy Happy

Quote
I can't wait to finally lower the cabin pressure for the EVA

Me too!... Rolling Eyes

Hi Tschachim, do you think you could do that for us?
Logged
Tschachim
Project Apollo - NASSP
Administrator
Hero Member
*****
Posts: 3700


nassp.sf.net


View Profile WWW
« Reply #4 on: April 06, 2007, 03:29:35 PM »

Sure, but I'm going to finish the SPS (and the remaining RCS stuff if nobody beats me) at first.

Cheers
Tschachim
Logged

Coussini
Project Team Member
Hero Member
****
Posts: 699


View Profile
« Reply #5 on: April 10, 2007, 04:37:53 AM »

Goody Gooda  Thumbs Up
Logged

Have a nice day
NoName
Project Team Member
Hero Member
****
Posts: 795


View Profile
« Reply #6 on: August 19, 2007, 07:01:18 PM »

This is the latest state of the left side wall and it's panels:



Only a few labels have to be added as well as the background on the lower right dark area. I decided to not commit the latest panel stuff, including the final lower equipment bay, until I have the new CM interior photos of Swatch to be able to add the few missing labels and details.

Meanwhile I'm going to start with the right hand side panels (cb panels)...
Logged
Pages: [1] Print 
« previous next »
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.10 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!