Meadville Space Center
Welcome, Guest. Please login or register.
December 09, 2019, 10:40:28 PM

Login with username, password and session length
Search:     Advanced search
Welcome to the new Meadville Space Center forums!
25068 Posts in 2094 Topics by 2266 Members
Latest Member: twa517
* Home Help Search Login Register
+  Meadville Space Center
|-+  Project Apollo - NASSP
| |-+  Project Apollo - NASSP News & Discussion
| | |-+  News & Announcements (Moderators: movieman, Tschachim, Swatch, lassombra)
| | | |-+  ProjectApollo Progress (Updated for June...)
« previous next »
Pages: [1] Print
Author Topic: ProjectApollo Progress (Updated for June...)  (Read 9173 times)
Swatch
Moderator
Hero Member
****
Posts: 1003


jasonims
View Profile
« on: May 18, 2006, 03:27:06 PM »

This is a list of the major and minor projects that are part of Project Apollo.  If you're interested in helping, hopefully this list will give you a good idea of what's needed.  If there is anything not on here that you think I have missed, please tell me.  I will add to this as updates become available and as time permits....corrections welcome.

Quote
KEY
Completed Projects will be highlighted in BLUE
Works in Progress will be highlighted in RED
Partially Completed Projects will be highlighted in PURPLE (These projects are not currently pursued)
Future Projects will be in BLACK
Priority will be denoted by  :!:'s  (No Priority= no symbol, Low= :!:, Medium= :!::!:,  High= :!::!::!: )
(All Supplimentary Notes will be in parenthesis)
Project Coordinator/Author will be italicized in Green.

Project Apollo Outlook

Mission Implementation:

Manned Missions:
Lunar:
-Apollo 8
-Apollo 10
-Apollo 11
--1201 Alarm
-Apollo 12
--Lightning Strike and Resulting Malfunction
-Apollo 13
--Explosion
-Apollo 14
--Landing Radar Failure
--Lunar Rickshaw
-Apollo 15
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 16
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 17
--LRV Swatch and Redburne
LEO:
-Apollo 7
-Apollo 9
Skylab: missleman01
-Skylab 1
--EVA Repair
-Skylab 2
-Skylab 3
-Skylab 4
ASTP:
-Apollo 18 (ASTP)
--Docking Adapter
--Soyuz
Unmanned Missions: movieman
Hardware Qualification:
-Little Joe Swatch
-Escape System Tests
Early Saturns:
-Saturn I-Block I Launches
-Saturn I-Block II Launches
-Saturn IB Launches
Hardware Evaluation:
-Apollo 4
-Apollo 5 movieman
--LM-1
-Apollo 6
--Flight Malfunctions

Realism Implementation:

Mission Phases:
Pre-Launch: Tschachim
-Assembly
-Roll-Out
-Systems Check
Launch: Tschachim
LEO-Low Earth Orbit: Tschachim
TLI-Trans-Lunar Injection: LazyD & Tschachim [/color]
TLC-Trans-Lunar Coast:
-Mid-Course Corrections LazyD[/color]
TPD-TransPosition and Docking Tschachim
-Smooth Docking Capture Swatch
-Correct Docking Procedures
LOI-Lunar Orbit Insertion
Lunar Orbit Operations
Powered Descent and Landing
LSO-Lunar Surface Operations
Powered Ascent and Docking LazyD[/color] (was working, temperarily out of order)
TEI-Trans-Earth Injection
TEC-Trans-Earth Coast
-Mid-Course Corrections LazyD[/color]
Re-Entry chode
-CSM Seperation movieman
-SM Break-up movieman
-Proper Entry Corridor LazyD[/color]
-Accurate Landing LazyD[/color]
CM Systems:
GN&C dseagrav
Optics Swatch & dseagrav
ECS Tschachim & movieman
EPS Tschachim & movieman
RCS Tschachim & dseagrav
SPS Tschachim & dseagrav
TelComm dseagrav
LM Systems:
GN&C dseagrav
Optics Swatch & dseagrav
ECS
Radar and Landing
EPS dseagrav
RCS & Engine dseagrav
TelComm
Interface:
CSM Panels: Moonwalker
-Main Display Consoles
-GNC/Optics
-ECS

- 100s
-200s
-300s

LM Panels:  dseagrav & Moonwalker
-Main Panel
-Circuit Breakers
-EPS/Comm

-Optics
-Landing
External Controls:
-Joystick Interface dseagrav
-DSKY Interface Support
Virtual Mission Control Consoles Preliminary work being done for Mercury and Gemini Projects by Rob Conley, ProjectApollo work by dseagrav[/color]


Modelling:  Swatch, orbiterfan

Spacecraft:
Saturn:
-Saturn V TomPA
-Saturn V/Skylab
-Saturn 1B McDope & Brad Hodges
-Early Saturns orbiterfan
-Little Joe II Swatch
Apollo:
-CM P64 & Swatch & Tschachim
-SM Swatch
-SIM Bay Ford Perfect
--Sub-Satellite Mike
-LEM Ron Monsen & Rodion
-Crew Rodion
--EVA
--Flight Coveralls
-LES/BoostCover Swatch
-Skylab missleman01
Landing Site/LEVA:
Landing Sites:
-Tranquility Base Rodion
-Oceanus Procellarum (Ocean of Storms) jtiberius
--Surveyor 3 Tim Lutton
-Fra Mauro Rodion & jtiberius
-Hadley-Appennine jtiberius
-Descartes Highlands Rodion
-Taurus-Littrow Ford Perfect & jtiberius
-Marius Hills Rodion
-Schroter's Valley
-Copernicus Rodion
-Tycho
-Gassendi
Lunar Operations:
-LRV Rodion & Swatch
--Virtual Console Redburne
-CDR Lunar EVA Rodion
-LMP Lunar EVA Rodion
-Lunar Surface Drill
-ALSEP (instruments will be shown in blue as they are completed) missleman01
--Passive Seismic, Active Seismic, Magnetometer, Solar Wind, Suprathermal Ion, Heat Flow, Charged Particle, Cold Cathode Guage, Lunar Field Geology, Laser Ranging Retro-Reflector
-Golfclub
KSC:
Launch Pads:
-LC39 A & B Tschachim
-LC37 A & B kev33 & Swatch (original by missleman01)
-LC34 kev33 & Swatch (original by Brad Hodges & SimNASA)
Scenery:
-Crawlerway orbiterfan & Tschachim
-LCC orbiterfan
-Transport Barge
Functional:
-VAB orbiterfan
-Crawler orbiterfan
-MLP orbiterfan
-LUT orbiterfan
-MSS orbiterfan

Documentation:  [color=dark green]Christophe, irengineer[/color]

Mission Profiles
~Numerical Data and Parameters
~Brief Mission Overview
Mathematical Calculations irengineer
User's Manuals: 1960's NASA Engineers & Christophe (yes, we're getting that real Wink )
Apollo Project User's Manual
CM User's Manual
LM User's Manual
AGC User's Manual
Tutorials/Checklists: Christophe & Toadtal
Pre-Launch Checklist
Launch Checklist
Basic AGC Interface Tutorial (can be included in AGC User's Manual)
TLI Checklist
Maneuvering Tutorial
TPD Checklist/Tutorial

LEM Power-Up Checklist
Lunar Landing Tutorial
Features Log Tschachim

Extras:

Eye Candy:
LRV Animations Tschachim, Swatch
Apollo Stack/Build Tschachim
Apollo Recovery Operations
What If's:
Lost Missions (18, 19, 20, 13 without explosion)
-Lunar Rover Mk2
Skylab, The Way it Should Have Been
Apollo Applications Project movieman
-Apollo to Venus
-Alternate Saturns
Make Your Own Mission (plot course and fly to moon using generic set up)
Failures (What if something went wrong, could you make it back home?)


And a special thanks to Tschachim for playing the part of leader in this otherwise helter skelter group and Rob Conley for loaning us this "office space" at the Meadville Space Center.
« Last Edit: July 31, 2008, 09:55:42 AM by Tschachim » Logged

My Project Apollo Work:
CM Visual
 -VC (~75% complete: texture work beginning again; mesh-78%; texture-70%)
Propulsion Particle Improvements (Focused on S1B right now, BETA 1.0 has been commited)
New Docking Method (~50% complete: research complete; coding partially completed, testing not underway)

Future Work:  (if it's here, it's deemed unnecessary to upcoming release)

Older Work:  (if it's here, it's fair game to whoever wants to improve)
EMS Implementation (committed: minor flaws, but groundwork is there, needs extensive testing)
EMS scrolls (committed: not refined, but usable)
SM Visual (committed: mesh-finished, texture-60%; possibly revisited in future)
J2 Texture (commited: room for improvement)
LRV (committed: mesh-finished, texture-90%; in future a ground up rebuild may be in order, but not on my plans)
Swatch
Moderator
Hero Member
****
Posts: 1003


jasonims
View Profile
« Reply #1 on: July 31, 2006, 10:25:22 AM »

~OUTDATED!!!~~OUTDATED!!!~

This is a list of the major and minor projects that are part of Project Apollo.  If you're interested in helping, hopefully this list will give you a good idea of what's needed.  If there is anything not on here that you think I have missed, please tell me.  I will add to this as updates become available and as time permits....suggestions welcome.

Quote
KEY
Completed Projects will be highlighted in BLUE
Works in Progress will be highlighted in RED
Partially Completed Projects will be highlighted in PURPLE (These projects are not currently pursued)
Future Projects will be in BLACK
Priority will be denoted by  :!:'s  (No Priority= no symbol, Low= :!:, Medium= :!::!:,  High= :!::!::!: )
(All Supplimentary Notes will be in parenthesis)
Project Coordinator/Author will be italicized in Green.

Project Apollo Outlook

Mission Implementation:

Manned Missions:
Lunar:
-Apollo 8
-Apollo 10
-Apollo 11
--1201 Alarm
-Apollo 12
--Lightning Strike and Resulting Malfunction
-Apollo 13
--Explosion
-Apollo 14
--Landing Radar Failure
--Lunar Rickshaw
-Apollo 15
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 16
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 17
--LRV Swatch and Redburne
LEO:
-Apollo 7
-Apollo 9
Skylab: missleman01
-Skylab 1
--EVA Repair
-Skylab 2
-Skylab 3
-Skylab 4
ASTP:
-Apollo 18
--Docking Adapter
--Soyuz
Unmanned Missions:
Hardware Qualification:
-Little Joe Swatch
-Escape System Tests
Early Saturns:
-Saturn I-Block I Launches
-Saturn I-Block II Launches
-Saturn IB Launches
Hardware Evaluation:
-Apollo 4
-Apollo 5 movieman
--LM-1
-Apollo 6
--Flight Malfunctions

Realism Implementation:

Mission Phases:
Pre-Launch:
-Assembly
-Roll-Out
-Systems Check
Launch
LEO-Low Earth Orbit
TLI-Trans-Lunar Injection LazyD[/color]
TLC-Trans-Lunar Coast
-Mid-Course Corrections
TPD-TransPosition and Docking
-Smooth Docking Capture
-Correct Docking Procedures
LOI-Lunar Orbit Insertion
Lunar Orbit Operations
Powered Descent and Landing
LSO-Lunar Surface Operations
Powered Ascent and Docking
TEI-Trans-Earth Injection
TEC-Trans-Earth Coast
-Mid-Course Corrections
Re-Entry chode
-CSM Seperation movieman
-Proper Entry Corridor
-Accurate Landing
CM Systems:
GN&C dseagrav
Optics Swatch
ECS
EPS
RCS dseagrav
SPS dseagrav
TelComm dseagrav
LM Systems:
GN&C dseagrav
Optics Swatch
ECS
Radar and Landing
EPS dseagrav
RCS & Engine dseagrav
TelComm
Interface:
CSM Panels: Moonwalker
-Main Display Consoles
-Circuit Breakers
-GNC/Optics
-ECS

LM Panels:  dseagrav & Moonwalker
-Main Panel
-Circuit Breakers
-EPS/Comm
-Optics
-Landing

External Controls:
-Joystick Interface dseagrav
-DSKY Interface Support
Virtual Mission Control Consoles Preliminary work being done for Mercury and Gemini Projects by Rob Conley[/color]


Modelling:

Spacecraft:
Saturn:
-Saturn V TomPA
-Saturn V/Skylab
-Saturn 1B McDope & Brad Hodges
-Early Saturns orbiterfan
-Little Joe II Swatch
Apollo:
-CM P64 & Swatch
-SM Swatch
-SIM Bay Ford Perfect
--Sub-Satellite Mike
-LEM Ron Monsen & Rodion
-Crew Rodion
--EVA
--Flight Coveralls
-LES/BoostCover Swatch
-Skylab missleman01
Landing Site/LEVA:
Landing Sites:
-Tranquility Base Rodion
-Oceanus Procellarum (Ocean of Storms) jtiberius
--Surveyor 3 Tim Lutton
-Fra Mauro Rodion & jtiberius
-Hadley-Appennine jtiberius
-Descartes Highlands Rodion
-Taurus-Littrow Ford Perfect & jtiberius
-Marius Hills Rodion
-Schroter's Valley
-Copernicus Rodion
-Tycho
-Gassendi
Lunar Operations:
-LRV Rodion & Swatch
--Virtual Console Redburne
-CDR Lunar EVA Rodion
-LMP Lunar EVA Rodion
-Lunar Surface Drill
-ALSEP (instruments will be shown in blue as they are completed) missleman01
--Passive Seismic, Active Seismic, Magnetometer, Solar Wind, Suprathermal Ion, Heat Flow, Charged Particle, Cold Cathode Guage, Lunar Field Geology, Laser Ranging Retro-Reflector
-Golfclub
KSC:
Launch Pads:
-LC39 A & B tschachim
-LC37 A & B missleman01
-LC34 Brad Hodges & SimNASA
Scenery:
-Crawlerway orbiterfan
-LCC orbiterfan
-Transport Barge
Functional:
-VAB orbiterfan
-Crawler orbiterfan
-MLP orbiterfan
-LUT orbiterfan
-MSS orbiterfan

Documentation:

Mission Profiles
~Numerical Data and Parameters
~Brief Mission Overview
User's Manuals: 1960's NASA Engineers & Christophe (yes, we're getting that real Wink )
Apollo Project User's Manual
CM User's Manual
LM User's Manual
AGC User's Manual
Tutorials/Checklists: Christophe & Toadtal
Launch Checklist
Basic AGC Interface Tutorial (can be included in AGC User's Manual)
TLI Checklist
Maneuvering Tutorial
TPD Checklist/Tutorial
LEM Power-Up Checklist
Lunar Landing Tutorial
Features Log

Extras:

Eye Candy:
Apollo Stack/Build
Apollo Recovery Operations
What If's:
Lost Missions (18, 19, 20, 13 without explosion)
-Lunar Rover Mk2
Skylab, The Way it Should Have Been
Apollo Applications Project
Make Your Own Mission (plot course and fly to moon using generic set up)
Failures (What if something went wrong, could you make it back home?)

~OUTDATED!!!~~OUTDATED!!!~
« Last Edit: August 28, 2006, 05:04:10 PM by Swatch » Logged

My Project Apollo Work:
CM Visual
 -VC (~75% complete: texture work beginning again; mesh-78%; texture-70%)
Propulsion Particle Improvements (Focused on S1B right now, BETA 1.0 has been commited)
New Docking Method (~50% complete: research complete; coding partially completed, testing not underway)

Future Work:  (if it's here, it's deemed unnecessary to upcoming release)

Older Work:  (if it's here, it's fair game to whoever wants to improve)
EMS Implementation (committed: minor flaws, but groundwork is there, needs extensive testing)
EMS scrolls (committed: not refined, but usable)
SM Visual (committed: mesh-finished, texture-60%; possibly revisited in future)
J2 Texture (commited: room for improvement)
LRV (committed: mesh-finished, texture-90%; in future a ground up rebuild may be in order, but not on my plans)
Tschachim
Project Apollo - NASSP
Administrator
Hero Member
****
Posts: 3700


nassp.sf.net


View Profile WWW
« Reply #2 on: July 31, 2006, 12:02:47 PM »

Two silly questions:

Which of the 2 progress reports is the current one?
If I have some corrections to that should I post them here or should I send you a mail to keep this topic clean?

Cheers
Tschachim

Logged

Swatch
Moderator
Hero Member
****
Posts: 1003


jasonims
View Profile
« Reply #3 on: July 31, 2006, 12:46:00 PM »

One says updated for May...the other one says Updated for July....if this is too confusing, I'll just have one posted at a time....I wasn't sure if anyone wanted to see how it had changed or not.

If it's easier, then I'll just post one list and delete the others.
Logged

My Project Apollo Work:
CM Visual
 -VC (~75% complete: texture work beginning again; mesh-78%; texture-70%)
Propulsion Particle Improvements (Focused on S1B right now, BETA 1.0 has been commited)
New Docking Method (~50% complete: research complete; coding partially completed, testing not underway)

Future Work:  (if it's here, it's deemed unnecessary to upcoming release)

Older Work:  (if it's here, it's fair game to whoever wants to improve)
EMS Implementation (committed: minor flaws, but groundwork is there, needs extensive testing)
EMS scrolls (committed: not refined, but usable)
SM Visual (committed: mesh-finished, texture-60%; possibly revisited in future)
J2 Texture (commited: room for improvement)
LRV (committed: mesh-finished, texture-90%; in future a ground up rebuild may be in order, but not on my plans)
Tschachim
Project Apollo - NASSP
Administrator
Hero Member
****
Posts: 3700


nassp.sf.net


View Profile WWW
« Reply #4 on: July 31, 2006, 01:45:58 PM »

I knew it was a silly question, I didn't look at the subtitle, sorry.

A few "change requests":
  • Apollo 4 and 6 are "Partially Completed", most of the missions should work.
  • "Systems Check" (= Prelaunch) between "Roll-Out" and "Launch" is "Works in Progress" by me, Launch, LEO and Transposition & Docking, too.
  • LOI is "Partially Completed" since we've already an AGC++ program for that.
  • CSM RCS and SPS is "Works in Progress" by me.

Cheers
Tschachim
Logged

Swatch
Moderator
Hero Member
****
Posts: 1003


jasonims
View Profile
« Reply #5 on: August 28, 2006, 05:02:29 PM »

~OUTDATED!!!~~OUTDATED!!!~

This is a list of the major and minor projects that are part of Project Apollo.  If you're interested in helping, hopefully this list will give you a good idea of what's needed.  If there is anything not on here that you think I have missed, please tell me.  I will add to this as updates become available and as time permits....suggestions welcome.

Quote
KEY
Completed Projects will be highlighted in BLUE
Works in Progress will be highlighted in RED
Partially Completed Projects will be highlighted in PURPLE (These projects are not currently pursued)
Future Projects will be in BLACK
Priority will be denoted by  :!:'s  (No Priority= no symbol, Low= :!:, Medium= :!::!:,  High= :!::!::!: )
(All Supplimentary Notes will be in parenthesis)
Project Coordinator/Author will be italicized in Green.

Project Apollo Outlook

Mission Implementation:

Manned Missions:
Lunar:
-Apollo 8
-Apollo 10
-Apollo 11
--1201 Alarm
-Apollo 12
--Lightning Strike and Resulting Malfunction
-Apollo 13
--Explosion
-Apollo 14
--Landing Radar Failure
--Lunar Rickshaw
-Apollo 15
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 16
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 17
--LRV Swatch and Redburne
LEO:
-Apollo 7
-Apollo 9
Skylab: missleman01
-Skylab 1
--EVA Repair
-Skylab 2
-Skylab 3
-Skylab 4
ASTP:
-Apollo 18 (ASTP)
--Docking Adapter
--Soyuz
Unmanned Missions:
Hardware Qualification:
-Little Joe Swatch
-Escape System Tests
Early Saturns:
-Saturn I-Block I Launches
-Saturn I-Block II Launches
-Saturn IB Launches
Hardware Evaluation:
-Apollo 4
-Apollo 5 movieman
--LM-1
-Apollo 6
--Flight Malfunctions

Realism Implementation:

Mission Phases:
Pre-Launch: Tschachim
-Assembly
-Roll-Out
-Systems Check
Launch: Tschachim
LEO-Low Earth Orbit: Tschachim
TLI-Trans-Lunar Injection: LazyD & Tschachim [/color]
TLC-Trans-Lunar Coast:
-Mid-Course Corrections LazyD[/color]
TPD-TransPosition and Docking Tschachim
-Smooth Docking Capture Swatch
-Correct Docking Procedures
LOI-Lunar Orbit Insertion
Lunar Orbit Operations
Powered Descent and Landing
LSO-Lunar Surface Operations
Powered Ascent and Docking LazyD[/color] (was working, temperarily out of order)
TEI-Trans-Earth Injection
TEC-Trans-Earth Coast
-Mid-Course Corrections LazyD[/color]
Re-Entry chode
-CSM Seperation movieman
-SM Break-up movieman
-Proper Entry Corridor
-Accurate Landing
CM Systems:
GN&C dseagrav
Optics Swatch
ECS
EPS
RCS Tschachim & dseagrav
SPS Tschachim & dseagrav
TelComm dseagrav
LM Systems:
GN&C dseagrav
Optics Swatch
ECS
Radar and Landing
EPS dseagrav
RCS & Engine dseagrav
TelComm
Interface:
CSM Panels: Moonwalker
-Main Display Consoles
-Circuit Breakers
-GNC/Optics
-ECS

LM Panels:  dseagrav & Moonwalker
-Main Panel
-Circuit Breakers
-EPS/Comm
-Optics
-Landing

External Controls:
-Joystick Interface dseagrav
-DSKY Interface Support
Virtual Mission Control Consoles Preliminary work being done for Mercury and Gemini Projects by Rob Conley, ProjectApollo work by dseagrav[/color]


Modelling:

Spacecraft:
Saturn:
-Saturn V TomPA
-Saturn V/Skylab
-Saturn 1B McDope & Brad Hodges
-Early Saturns orbiterfan
-Little Joe II Swatch
Apollo:
-CM P64 & Swatch
-SM Swatch
-SIM Bay Ford Perfect
--Sub-Satellite Mike
-LEM Ron Monsen & Rodion
-Crew Rodion
--EVA
--Flight Coveralls
-LES/BoostCover Swatch
-Skylab missleman01
Landing Site/LEVA:
Landing Sites:
-Tranquility Base Rodion
-Oceanus Procellarum (Ocean of Storms) jtiberius
--Surveyor 3 Tim Lutton
-Fra Mauro Rodion & jtiberius
-Hadley-Appennine jtiberius
-Descartes Highlands Rodion
-Taurus-Littrow Ford Perfect & jtiberius
-Marius Hills Rodion
-Schroter's Valley
-Copernicus Rodion
-Tycho
-Gassendi
Lunar Operations:
-LRV Rodion & Swatch
--Virtual Console Redburne
-CDR Lunar EVA Rodion
-LMP Lunar EVA Rodion
-Lunar Surface Drill
-ALSEP (instruments will be shown in blue as they are completed) missleman01
--Passive Seismic, Active Seismic, Magnetometer, Solar Wind, Suprathermal Ion, Heat Flow, Charged Particle, Cold Cathode Guage, Lunar Field Geology, Laser Ranging Retro-Reflector
-Golfclub
KSC:
Launch Pads:
-LC39 A & B Tschachim
-LC37 A & B kev33 & Swatch (original by missleman01)
-LC34 kev33 & Swatch (original by Brad Hodges & SimNASA)
Scenery:
-Crawlerway orbiterfan & Tschachim
-LCC orbiterfan
-Transport Barge
Functional:
-VAB orbiterfan
-Crawler orbiterfan
-MLP orbiterfan
-LUT orbiterfan
-MSS orbiterfan

Documentation:

Mission Profiles
~Numerical Data and Parameters
~Brief Mission Overview
Mathematical Calculations irengineer
User's Manuals: 1960's NASA Engineers & Christophe (yes, we're getting that real Wink )
Apollo Project User's Manual
CM User's Manual
LM User's Manual
AGC User's Manual
Tutorials/Checklists: Christophe & Toadtal
Pre-Launch Checklist
Launch Checklist
Basic AGC Interface Tutorial (can be included in AGC User's Manual)
TLI Checklist
Maneuvering Tutorial
TPD Checklist/Tutorial
LEM Power-Up Checklist
Lunar Landing Tutorial
Features Log Tschachim

Extras:

Eye Candy:
Apollo Stack/Build
Apollo Recovery Operations
What If's:
Lost Missions (18, 19, 20, 13 without explosion)
-Lunar Rover Mk2
Skylab, The Way it Should Have Been
Apollo Applications Project movieman
-Apollo to Venus
-Alternate Saturns
Make Your Own Mission (plot course and fly to moon using generic set up)
Failures (What if something went wrong, could you make it back home?)

~OUTDATED!!!~~OUTDATED!!!~
« Last Edit: August 28, 2006, 05:17:32 PM by Swatch » Logged

My Project Apollo Work:
CM Visual
 -VC (~75% complete: texture work beginning again; mesh-78%; texture-70%)
Propulsion Particle Improvements (Focused on S1B right now, BETA 1.0 has been commited)
New Docking Method (~50% complete: research complete; coding partially completed, testing not underway)

Future Work:  (if it's here, it's deemed unnecessary to upcoming release)

Older Work:  (if it's here, it's fair game to whoever wants to improve)
EMS Implementation (committed: minor flaws, but groundwork is there, needs extensive testing)
EMS scrolls (committed: not refined, but usable)
SM Visual (committed: mesh-finished, texture-60%; possibly revisited in future)
J2 Texture (commited: room for improvement)
LRV (committed: mesh-finished, texture-90%; in future a ground up rebuild may be in order, but not on my plans)
AngusYoung17T
Jr. Member
**
Posts: 3


View Profile
« Reply #6 on: February 02, 2007, 02:03:17 PM »

Hey thanks for the detailed list. I see that the list hasn't been updated since last May. Could you please update the list again?

THANKS!!!!
Logged
Swatch
Moderator
Hero Member
****
Posts: 1003


jasonims
View Profile
« Reply #7 on: June 20, 2007, 07:47:31 AM »

~OUTDATED!!!~~OUTDATED!!!~

This is a list of the major and minor projects that are part of Project Apollo.  If you're interested in helping, hopefully this list will give you a good idea of what's needed.  If there is anything not on here that you think I have missed, please tell me.  I will add to this as updates become available and as time permits....corrections welcome.

Quote
KEY
Completed Projects will be highlighted in BLUE
Works in Progress will be highlighted in RED
Partially Completed Projects will be highlighted in PURPLE (These projects are not currently pursued)
Future Projects will be in BLACK
Priority will be denoted by  :!:'s  (No Priority= no symbol, Low= :!:, Medium= :!::!:,  High= :!::!::!: )
(All Supplimentary Notes will be in parenthesis)
Project Coordinator/Author will be italicized in Green.

Project Apollo Outlook

Mission Implementation:

Manned Missions:
Lunar:
-Apollo 8
-Apollo 10
-Apollo 11
--1201 Alarm
-Apollo 12
--Lightning Strike and Resulting Malfunction
-Apollo 13
--Explosion
-Apollo 14
--Landing Radar Failure
--Lunar Rickshaw
-Apollo 15
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 16
--SubSatellite (needs implementation into scenario)
--LRV Swatch and Redburne
-Apollo 17
--LRV Swatch and Redburne
LEO:
-Apollo 7
-Apollo 9
Skylab: missleman01
-Skylab 1
--EVA Repair
-Skylab 2
-Skylab 3
-Skylab 4
ASTP:
-Apollo 18 (ASTP)
--Docking Adapter
--Soyuz
Unmanned Missions: movieman
Hardware Qualification:
-Little Joe Swatch
-Escape System Tests
Early Saturns:
-Saturn I-Block I Launches
-Saturn I-Block II Launches
-Saturn IB Launches
Hardware Evaluation:
-Apollo 4
-Apollo 5 movieman
--LM-1
-Apollo 6
--Flight Malfunctions

Realism Implementation:

Mission Phases:
Pre-Launch: Tschachim
-Assembly
-Roll-Out
-Systems Check
Launch: Tschachim
LEO-Low Earth Orbit: Tschachim
TLI-Trans-Lunar Injection: LazyD & Tschachim [/color]
TLC-Trans-Lunar Coast:
-Mid-Course Corrections LazyD[/color]
TPD-TransPosition and Docking Tschachim
-Smooth Docking Capture Swatch
-Correct Docking Procedures
LOI-Lunar Orbit Insertion
Lunar Orbit Operations
Powered Descent and Landing
LSO-Lunar Surface Operations
Powered Ascent and Docking LazyD[/color] (was working, temperarily out of order)
TEI-Trans-Earth Injection
TEC-Trans-Earth Coast
-Mid-Course Corrections LazyD[/color]
Re-Entry chode
-CSM Seperation movieman
-SM Break-up movieman
-Proper Entry Corridor
-Accurate Landing
CM Systems:
GN&C dseagrav
Optics Swatch & dseagrav
ECS Tschachim & movieman
EPS Tschachim & movieman
RCS Tschachim & dseagrav
SPS Tschachim & dseagrav
TelComm dseagrav
LM Systems:
GN&C dseagrav
Optics Swatch & dseagrav
ECS
Radar and Landing
EPS dseagrav
RCS & Engine dseagrav
TelComm
Interface:
CSM Panels: Moonwalker
-Main Display Consoles
-GNC/Optics
-ECS

- 100s
-200s
-300s

LM Panels:  dseagrav & Moonwalker
-Main Panel
-Circuit Breakers
-EPS/Comm
-Optics
-Landing

External Controls:
-Joystick Interface dseagrav
-DSKY Interface Support
Virtual Mission Control Consoles Preliminary work being done for Mercury and Gemini Projects by Rob Conley, ProjectApollo work by dseagrav[/color]


Modelling:  [color=dark green]Swatch, orbiterfan[/color]

Spacecraft:
Saturn:
-Saturn V TomPA
-Saturn V/Skylab
-Saturn 1B McDope & Brad Hodges
-Early Saturns orbiterfan
-Little Joe II Swatch
Apollo:
-CM P64 & Swatch
-SM Swatch
-SIM Bay Ford Perfect
--Sub-Satellite Mike
-LEM Ron Monsen & Rodion
-Crew Rodion
--EVA
--Flight Coveralls
-LES/BoostCover Swatch
-Skylab missleman01
Landing Site/LEVA:
Landing Sites:
-Tranquility Base Rodion
-Oceanus Procellarum (Ocean of Storms) jtiberius
--Surveyor 3 Tim Lutton
-Fra Mauro Rodion & jtiberius
-Hadley-Appennine jtiberius
-Descartes Highlands Rodion
-Taurus-Littrow Ford Perfect & jtiberius
-Marius Hills Rodion
-Schroter's Valley
-Copernicus Rodion
-Tycho
-Gassendi
Lunar Operations:
-LRV Rodion & Swatch
--Virtual Console Redburne
-CDR Lunar EVA Rodion
-LMP Lunar EVA Rodion
-Lunar Surface Drill
-ALSEP (instruments will be shown in blue as they are completed) missleman01
--Passive Seismic, Active Seismic, Magnetometer, Solar Wind, Suprathermal Ion, Heat Flow, Charged Particle, Cold Cathode Guage, Lunar Field Geology, Laser Ranging Retro-Reflector
-Golfclub
KSC:
Launch Pads:
-LC39 A & B Tschachim
-LC37 A & B kev33 & Swatch (original by missleman01)
-LC34 kev33 & Swatch (original by Brad Hodges & SimNASA)
Scenery:
-Crawlerway orbiterfan & Tschachim
-LCC orbiterfan
-Transport Barge
Functional:
-VAB orbiterfan
-Crawler orbiterfan
-MLP orbiterfan
-LUT orbiterfan
-MSS orbiterfan

Documentation:  [color=dark green]Christophe, irengineer[/color]

Mission Profiles
~Numerical Data and Parameters
~Brief Mission Overview
Mathematical Calculations irengineer
User's Manuals: 1960's NASA Engineers & Christophe (yes, we're getting that real Wink )
Apollo Project User's Manual
CM User's Manual
LM User's Manual
AGC User's Manual
Tutorials/Checklists: Christophe & Toadtal
Pre-Launch Checklist
Launch Checklist
Basic AGC Interface Tutorial (can be included in AGC User's Manual)
TLI Checklist
Maneuvering Tutorial
TPD Checklist/Tutorial
LEM Power-Up Checklist
Lunar Landing Tutorial
Features Log Tschachim

Extras:

Eye Candy:
Animations Tschachim, Swatch (put on hold until Orbiter2006 glitch is patched)
Apollo Stack/Build
Apollo Recovery Operations
What If's:
Lost Missions (18, 19, 20, 13 without explosion)
-Lunar Rover Mk2
Skylab, The Way it Should Have Been
Apollo Applications Project movieman
-Apollo to Venus
-Alternate Saturns
Make Your Own Mission (plot course and fly to moon using generic set up)
Failures (What if something went wrong, could you make it back home?)


And a special thanks to Tschachim for playing the part of leader in this otherwise helter skelter group and Rob Conley for loaning us this "office space" at the Meadville Space Center.

~OUTDATED!!!~~OUTDATED!!!~
« Last Edit: June 20, 2007, 09:01:10 AM by Swatch » Logged

My Project Apollo Work:
CM Visual
 -VC (~75% complete: texture work beginning again; mesh-78%; texture-70%)
Propulsion Particle Improvements (Focused on S1B right now, BETA 1.0 has been commited)
New Docking Method (~50% complete: research complete; coding partially completed, testing not underway)

Future Work:  (if it's here, it's deemed unnecessary to upcoming release)

Older Work:  (if it's here, it's fair game to whoever wants to improve)
EMS Implementation (committed: minor flaws, but groundwork is there, needs extensive testing)
EMS scrolls (committed: not refined, but usable)
SM Visual (committed: mesh-finished, texture-60%; possibly revisited in future)
J2 Texture (commited: room for improvement)
LRV (committed: mesh-finished, texture-90%; in future a ground up rebuild may be in order, but not on my plans)
Pages: [1] Print 
« previous next »
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.10 | SMF © 2006-2009, Simple Machines LLC Valid XHTML 1.0! Valid CSS!